The 8033 mT weighing SNX Topside is fabricated at the Daewoo Structural and Marine Engineering (DSME) Okpo yard in South Korea. The Heavy Transport Vessel Osprey from OHT transported the Topside, Flareboom and bridge to the Nemba field, offshore Angola. The platform is successfully installed by the SSCV Thialf.