The PUQ platform for UTE ACS-Cobra Castor is installed in the Mediterranean Sea approximately 21 km from the coast of Spain near Vinaroz in approximately 60 m water depth. The Jacket weighing approximately 4500 mT was fabricated and loaded out at the Dragados Offshore yard in Puerto Real, Cádiz, Spain. The Deck weighing approximately 9000 mT was fabricated at the Kiewit Offshore yard in Ingleside, Texas, USA and transported on the cargo barge H541 to the offshore installation location.